Schneider Electric progresses phased-delivery of over $290m in AI infrastructure solutions

Schneider Electric, together with Motivair by Schneider Electric is announcing the successful phased-delivery of more than $290M of AI infrastructure solutions for TeraWulf’s Lake Mariner data campus.

  • Monday, 1st June 2026 Posted 42 minutes ago in by Phil Alsop

The partnership underscores the three companies’ shared commitment to enabling accelerated, scalable and reliable compute capacity for the AI era. At a moment when “time to power” has become the defining constraint on U.S. AI growth, the project demonstrates how integrated power, cooling, and digital intelligence can bring new capacity online at the pace that AI demands.

 

Upon full buildout, TeraWulf’s Lake Mariner campus is projected to support up to 750 MW of power demand, leveraging the legacy industrial site and existing power infrastructure, and transforming it into a next-generation digital infrastructure campus for HPC, cloud and AI workloads. 

 

By combining technical design, engineering expertise, advanced energy infrastructure, innovative cooling technologies, and supportive software and services from Schneider Electric, the partnership assists TeraWulf in meeting increasing demand for AI-ready data centers while optimizing energy and operational performance. 

 

Strategically located to leverage low-cost, reliable power and scalable infrastructure, the Lake Mariner campus is supported by long-term lease commitments from anchor tenants, Core42 and Fluidstack (backed by Google). The site draws from a New York regional power grid whose mix is approximately 89% zero-carbon, with substantial surplus power available to support customers’ HPC and AI workloads.

 

“TeraWulf’s strategy is centered on delivering scalable, energy efficient infrastructure capable of supporting the increasing intensity of AI and HPC workloads,” said Sean Farrell, Chief Operating Officer at TeraWulf. “By working closely with industry leaders like Schneider Electric and Motivair, we are accelerating the development of AI-ready capacity at our Lake Mariner facilities while reinforcing the strong operational foundations needed to support long-term customer demand.”

 

As the leading energy technology partner, the project required Schneider Electric and Motivair to meet demanding construction and operational timelines as TeraWulf sought to transform the site into a series of purpose-built, AI data centers within a twelve-month timeframe. 

 

TeraWulf also required technical design and engineering guidance to deploy Schneider Electric Galaxy VX Uninterruptible Power Supply (UPS), Galaxy Lithium-ion Battery Systems, Motivair Coolant Distribution Units (CDUs), In-Rack Manifolds and ChilledDoors, as well as NetShelter Racks and Enclosures. In addition, Schneider Electric’s award-winning software solution, EcoStruxure IT Data Center Expert, was integrated for advanced monitoring and digital intelligence, while Motivair's Client Services was utilized to anticipates risk, minimizes disruption, and maximize the cooling investment.

 

“As demand for AI infrastructure accelerates, ‘time to power’ has become a defining constraint on growth. Operators need partners who can bring together advanced infrastructure, services, and expertise in energy technology to underpin large-scale AI data center deployments at pace,” said Manish Kumar, Executive Vice President, Secure Power & Data Centers at Schneider Electric. “Our partnership with TeraWulf establishes a strategic blueprint for pairing on-site power, AI-enabled automation, advanced liquid cooling, and digital intelligence at a legacy industrial site. We are delivering resilient, efficient, and scalable data center solutions at the speed and scale this AI era demands.”

Emerson and SiMa.ai have collaborated to develop AI-enabled industrial PCs designed to support...
As European data centres face tighter regulations, sustainability demands and ageing VRLA...
Overview of the ATS Remote Annunciator and its role in supporting power monitoring and control...
A Healthier Earth introduces a carbon removal platform designed for use within digital...
Legrand has announced that its award-winning Keor FLEX modular Uninterruptible Power Supply (UPS)...
BCS Consultancy (BCS) has strengthened its presence in Southern Europe with two senior appointments...
8th Annual Report analyzes data on IT and data center outages including causes, frequency, costs,...
AVK, Eversheds Sutherland, JLL and Mace Construct join founding strategic partner CBRE, to support...