Substantial re-think required for data centre design and build

Andrew Fettes-Brown, Rider Levett Bucknall (RLB) Global Board Director, Head of Data Centres at RLB UK and Europe, outlines the results of the company’s recent research, the results of which suggest that the way in which future data centres are designed and built must be substantially rethought to accommodate supply chain constraints and sustainability measures.
In Part 2 of our interview with Datwyler at Data Centre World Frankfurt 2025, we spoke with Oliver...
At Data Centre World Frankfurt 2025, we spoke with Adrian Bolliger from Datwyler as part of a...
At Data Centre World Frankfurt 2025, we spoke with Nick Burnham from Avtron to hear his thoughts on...
At Data Centre World Frankfurt 2025, we spoke with Fernando Calle from Himoinsa about their...
We caught up with Manuel Schröder and Carsten Ludwig from R&M during Data Centre World Frankfurt...
Mark Yeeles, Schneider Electric’s Vice President, Secure Power Division, UK and Ireland,...
Mike Meyer, Managing Partner of Portman Partners, and Paul Cutliffe, Managing Director of Flint DC,...
DCS talks to Piller at the DCA's 2025 10x10 Event