Water, not power, the deciding factor for data centre location?

  • Monday, 8th June 2026 Posted 4 weeks ago in by Phil Alsop
Bill Tesarek, President of Alsay, explains that, as Texas accelerates its position as a hub for AI infrastructure, a less visible constraint is beginning to surface: water availability may become the limiting factor for future growth. While most attention remains on power and grid capacity, operators inside water infrastructure systems are seeing early signals that demand tied to AI is scaling faster than the systems designed to support it.
Mike Golding, SVP of Construction at VIRTUS Data Centres, discusses the successful delivery and...
Oskar Lampe, Regional Director at BCS Consultancy, discusses how supply chain disruption, material...
Albert Hofeldt, Chief Product and Technology Officer at Power Factors, discusses the launch of...
Peter Griffiths, Founder and Chairman of Argyll Data Development, argues that the energy efficiency...
Peter Huang, Global President of Thermal Management & Data Centre at Castrol, discusses the rising...
Following on from our highly successful North-East data centre roadshow, which took place in...
Following on from our highly successful North-East data centre roadshow, which took place in...
Richard Petrie, CTO at LINX, discusses the recent Uptime Institute’s Annual Outages Analysis...