Bill Tesarek, President of Alsay, explains that, as Texas accelerates its position as a hub for AI infrastructure, a less visible constraint is beginning to surface: water availability may become the limiting factor for future growth. While most attention remains on power and grid capacity, operators inside water infrastructure systems are seeing early signals that demand tied to AI is scaling faster than the systems designed to support it.